Build Daily

Projects

Submittals, RFIs and drawings, prepared and tracked.

Today page for the Westover Warehouse job with weather, crew, briefing and items needing attention

Build Daily prepares submittal packages and RFIs, sends them, and tracks who has each one and for how long. Drawings, specs, permits and meetings are kept on the same job.

Job overview

Open a job and see the weather, who's on site and what's overdue, with the most serious item at the top.

Submittals

Upload the cut sheets and fill out a short form. The submittal is numbered, gets your cover sheet and stamp, and goes to the reviewer as a link.

Submittal log showing draft, released and approved submittals with lead times

RFIs

When the foreman finds a beam where the duct is supposed to run, the RFI goes out that morning. The log shows who has it and how many days it's been open.

RFI log for Westover Warehouse with status, who has it and days open

Drawings and addenda

Upload an addendum and only the changed sheets replace the old ones. Compare any sheet against the prior revision to see what moved.

Drawing viewer open on a controls diagram with the markup tools

Permits and inspections

Every permit on the job with the issuing agency, the expiration date and the inspections tied to it.

Permit register with agency, dates and inspections per permit

Project list

All your jobs on one list, each with its phase, team and the item that's been waiting longest.

Project List with attention aging by job above the register

Also in Projects

  • Open tracking on every email you send
  • Reviewers answer from a link
  • Meeting minutes with action items
  • Specs, SDS sheets and directives
  • Model coordination and clash review in the browser

See it on your own work.