Write the question or clip the detail straight from the sheet. The architect answers from a link without an account, and you can see when it was opened. Once it's answered, the RFI pin on the drawing turns green, so the field sees the answer on the sheet they're working from.

How an RFI gets answered
- Your Foreman Finds a beam where the duct goes
- Your PM Clips the detail and sends it
- The Architect Answers from the link
- The Drawing Shows the answer on the sheet
- If It Costs Money It becomes a change order
What's in it
Writing the RFI
- Drawing clip
- Clip a section of the drawing and attach it to the question.
- RFI PDF
- Build Daily generates the numbered RFI PDF and files it on the job.
- Review link
- The architect answers from the email without an account and can attach a sketch.
Tracking
- Opened
- See when the recipient opened it.
- Days open
- Status, ball in court and days outstanding on the log.
- Status
- Draft, Open, Answered, Closed or Voided.
The Answer
- On the drawing
- The RFI pin on the sheet turns green when it's answered.
- Cost impact
- When the answer costs money, start a draft change order from the RFI. The two stay linked.
Part of Projects
Build Daily prepares submittal packages and RFIs, sends them, and tracks who has each one and for how long. Drawings, specs, permits and meetings are kept on the same job.
See Build Daily on your own work.
Basic $99Standard $149Pro $199Enterprise $249a month, whole company