Build Daily

Submittals

Upload the product data and Build Daily builds the package: numbered, with your cover sheet and review stamp, combined into one PDF and sent to the engineer as a review link. The log puts lead time next to the need-on-site date on every row, so a late RTU submittal stands out while there's still time to act.

Submittal log showing draft, released and approved submittals with lead times
Submittal log with release status and lead time on every row.

How a submittal gets approved

  1. Your PM Uploads the cut sheets
  2. Build Daily Numbers, stamps and binds the PDF
  3. The Engineer Reviews it from a link
  4. Your PM Releases it for fabrication
  5. The Field Logs the delivery

What's in it

Package

Upload
Add product data and shop drawings and fill out a short form. Numbering is automatic.
Cover sheet and stamp
Your logo and a review stamp block on the cover, with everything combined into one PDF.
Lead time
Each row shows lead time and the days left before the equipment is needed on site.
Revisions
Each resubmittal is a new revision. Earlier revisions are kept.

Review

Review link
The reviewer downloads the package, uploads markups and records a decision without an account.
Opened
See when the reviewer opened it.
Decisions
Approved, Approved as Noted, Revise and Resubmit, Rejected, or Returned Without Review.
Ball in court
Whether each submittal is with you, with the reviewer, or complete.

Release and Delivery

Release
Release for fabrication, for use or to ship. The release copy files to the job.
Delivery dates
Scheduled and actual delivery on each submittal, so released items that haven't arrived stand out.

Part of Projects

Build Daily prepares submittal packages and RFIs, sends them, and tracks who has each one and for how long. Drawings, specs, permits and meetings are kept on the same job.

See All of Projects

See Build Daily on your own work.

Basic $99Standard $149Pro $199Enterprise $249a month, whole company