Build Daily

Estimating and Takeoff

Takeoff that prices the bid as you trace.

Visual Takeoff on an HVAC plan with supply duct mains, round branches and diffusers traced in red

Trace duct, pipe, plumbing and electrical on the PDF and the estimate fills in with priced material and labor hours as you go. Send quote requests, level what comes back and send each GC its own proposal.

Duct takeoff

Pick the system and spec and trace the run. Elbows, tees, taps, hangers and insulation are added to the estimate as you draw.

Live pricing

Material is priced and hours are figured below the drawing while you trace. Anything without a price is flagged right away, not on bid day.

Estimate Takeoff panel under the drawing with duct, fittings, insulation, hangers and dampers priced with labor hours

Sheet metal by gauge

The shop wants gauge and pounds, not linear feet. That total has its own tab, ready when they ask.

Trade Quantities tab listing ductwork by gauge with feet, square feet and pounds

Plumbing takeoff

Trace the water lines and place fixtures, and each fixture brings its connections. Domestic, DWV, gas, hydronic and refrigerant each price with their own pipe and fittings.

Plumbing plan with domestic water piping traced and water closets, lavatories and sinks placed

Your factors

Set material multipliers and labor factors by spec to match what your crews install, and the whole estimate follows them.

Specs and Factors tab with material multipliers and labor factors by spec and material group

Sheet setup

Upload the bid set and the sheet numbers and titles are read off the title blocks, so you're tracing within a few minutes.

Drawings list open on a takeoff showing three sheets filtered by Mechanical and Plumbing

Also in Estimating and Takeoff

  • Bid invitations to vendors and subs, with who opened them
  • Quotes side by side
  • A priced proposal for each contractor you bid to
  • Enter a target price and it backs into the markup
  • A won bid sets up the job with its budget and schedule of values
  • Win rate and bids still out

See it on your own work.